Supporting an aircraft modification in a maintenance facility

Congrats, you’re the one in charge of accomplishing a modification (mod) to your aircraft. Maybe it’s a new system that was dreamt up of your business development/marketing group, or an upgrade required by an Airworthiness Directive, or maybe even a new interior reconfiguration so your company can keep up with the competition. Whatever it is, you are now the person going to the maintenance facility who will be responsible for making sure it gets done on time and on budget. You may be the program manager, project engineer or even the maintenance representative. It could be your first time running a mod, or your fiftieth time. It doesn’t matter, you will experience pain. Guaranteed. To what degree depends on your experience and how well prepared you are. Since experience is just something you will have to gain, let’s go over some things to better prepare you for the upcoming mod. This is by no means a complete list, but for now, let’s just do an overview of the higher-level items.

Before you go to the maintenance facility:

1.       Know your schedule. I know this is obvious, but this is always the hardest task to stay on track on. Things always come up that will affect your schedule. Make sure you have correctly identified your key milestones and that you are always tracking to meet them. Of course, as these things start to affect your schedule, you should always have multiple contingency plans but do your best to keep to your milestones.

2.       What needs to be at the maintenance facility before the mod starts? Your installation kits and maybe some spare parts. What documentation do you need to make sure your parts are ready for use? Does the facility have an acceptance procedure that require the kits and parts to be there before a certain amount of time before the kits and parts can be issued and used? These are just some of the things that can hold up the start of your modification.

3.       Do you have all the necessary paperwork? Modification facilities require a complete installation package to be at their site a certain amount of time before the aircraft comes in. They have their procedures on how the paperwork is controlled and gets issued. Make sure you coordinate with them on these requirements or you will have the aircraft in with your parts, but no one will touch it because you have no authorized paperwork.

When you are onsite:

1.       Take care of all the administrative items ASAP. Badging, parking, security requirements and lunch times, including places to eat. These things should be handled right away so you can get started with the mod right away. You’ll be surprised how these things affect the tone of your mod.

2.       Establish when and where to have your status meetings. Depending on the scale of the installation, you may hold daily, weekly, or something else, as long as a schedule is set.

3.       Make sure you know everyone that is affecting your project. You usually establish a contact list prior to the start but you should make an effort to meet these people, know where they are located and see what type of schedule they have. Some folks you need aren’t going to be there the whole time. Maybe you won’t be onsite the whole time. Make sure you identify the people that are important to your project and know when your schedules match.

               

After the installation is done:

1.       Paperwork. Make sure everything that needs a signature, has a signature, including everything from the installation to the testing to the release of the aircraft. Everything must be signed off before that aircraft can leave the facility. Oh, and make sure that the people signing are actually qualified and/or certified to sign.

2.       Documentation. Make sure you have all the documents that are needed to show that the work is done and has been certified.

3.       Logistics. Figure out what parts, tools, etc. needs to be sent back out and which can stay. If you’re having the maintenance facility ship it, make sure they give you the tracking information.

So, there you have it! These are just some things to consider before you get that plane ticket and head to the maintenance facility. Not a complete list, but certainly something to get your mind going on what you need to have a successful mod. Hopefully this helped you out. Leave us a comment below on what you think. If you’d like us to write about other issues you might have on your aircraft modification projects, let us know. https://www.kros-wise.com